Friday, June 19, 2009

S P A C E

Thanks to a really soft mortgaging market and remarkable timing, we managed to put together one of those dream refi rates and loosen up a couple bucks. In return, 24 x 36 feet of storage goodness. This is slowing down the beginning of the Clipper project, but its a necessary slowdown to make building more efficient.

Due to roots and frost heaves, we ended up getting a sidewalk at the same time:



Posts set and getting the floor leveled:





Day three, concrete down, trusses up.

Note the difference in height. Im keeping the shop low for now to reduce the square footage I need to heat in winter. We will see how it works out building such a large boat with low overhead (7' door). The outer garage area will be 12' ceilings and an 11' door which should be gravy if the bigger boat needs headroom for things like hardtops and windshield installation:



What a nice day to work...





Can't wait to get the shop cleaned out of all of the storable goods and get to WORK!

No comments: